Dhaka --:--·Garment exporter·Bangladesh
01Ready-Made Garment Exporter · Bangladesh

Dressed
by Dhaka,
delivered
worldwide.

Book a consultation
Full-package apparel sourcing and production for EU and North American brands — tech pack to your DC.Or request a swatch book →
An artisan guiding denim through a Juki sewing machine on the Markten factory floor
Partner network · 8–12 floors✦Knits · Wovens · Denim · Outerwear✦Sample signed off on the floor✦Partner floors certified across OEKO-TEX, GRS, Sedex, ISO 9001, and more✦Dhaka, Bangladesh✦Markten since 2023 · family in the trade for decades✦One contract, everywhere it ships✦
§ 02 — Capability

Industrial capacity,
boutique precision.

Design, consultancy, manufacturing and logistics, managed end to end. From the first sketch to the final carton on the vessel.

Network · Bangladesh
Eight to twelve floors.
One standard across all of them.
Run size
5k–500k.
Units per run. Minimum order quantities negotiable by fabric family.
Global Reach
EU & North America.
Today. More markets as we grow.
The Craft
The craft is on the floor. The standard is ours.
The real capital of Bangladeshi apparel is accumulated skill — stitchers, cutters, quality inspectors who've spent a career perfecting a seam. The partners we work with bring that.
§ 03 — Services
§ 04 — Material Library

The fabric,
before the form.

Request swatch book →
Combed Cotton Jersey
M/001
Combed Cotton Jersey
180 GSM · 100% BCI Cotton
Raw Selvedge Denim
M/002
Raw Selvedge Denim
13.5 OZ · 98% COT · 2% ELA
Brushed Fleece
M/003
Brushed Fleece
320 GSM · 60% COT · 40% POLY
French Terry
M/004
French Terry
240 GSM · 100% COTTON
Performance Mesh
M/005
Performance Mesh
160 GSM · REC POLY · ELA
ELS Poplin
M/006
ELS Poplin
110 GSM · 100% ELS COTTON
§ 05 — The Journey

From your tech pack to
the vessel, in 45–75 days.

01
Design
7–14 DAYS

Tech pack review, first sample, material approval.

02
Source
10–21 DAYS

Fabric sourcing, lab dips, trim consolidation.

03
Make
20–30 DAYS

Cutting, sewing, finishing, inline QC.

04
Ship
7–10 DAYS

Final AQL, cartons, export clearance, vessel loading.

Then ocean transit: 18–22 days to the EU, 28–32 days to the US.

§ 06 — The Artisans

People, not
process codes.

Between them, over fifty years on the floor. The craft lives in the hands below — not in the spec sheet. Meet a few of the people who actually make the garments your customers will wear.

N° 01
Amina Khatun
Senior Pattern Maker · 10 yrs
N° 02
Saiful Hoque Amir
QC Line Supervisor · 13 yrs
N° 03
Anu Patel
Embroidery Specialist · 8 yrs
N° 04
Md Moshiur Rahman
Production Manager · 20 yrs
§ 07 — The Standards

Certified, not
claimed.

Every mark below is held by our partner floors and re-audited every year. The day a partner fails one is the day they leave the rotation.

CERT · 01
OEKO-TEX 100

Every thread tested for human-ecological safety.

CERT · 02
Sedex SMETA

Audited social and ethical practice, worldwide.

CERT · 03
RSC / Accord

Structural, electrical, and fire-safety certified factories.

CERT · 04
amfori BSCI

Continuous improvement on working conditions.

CERT · 05
GRS

Global Recycled Standard — traceable recycled content.

CERT · 06
BCI

Better Cotton Initiative — responsibly grown fibers.

CERT · 07
ISO 9001

Quality management system, independently audited.

CERT · 08
CTPAT

US customs-verified supply chain security.

§ 08 — Start a Project

Let's make
something you're proud of.

Configure your inquiry

Pick the closest — we'll refine on the first reply.

Category
Volume
Timeline

You'll be routed to our Knits specialist, with indicative capacity for 10k–50k units on a 60-day lead time.